Project Name
Location
County
Pavement Design Period (years)






TRAFFIC STRUCTURE
Total Number of Lanes (Both Directions)      
Roadway Classification/Truck Distribution      
Annual Average Daily Traffic (AADT)   Flexible Rigid
Percent of Trucks (T) Stone Base Thickness, in
Design Lane Traffic Subbase Stabilization Depth, in
Annual Growth Rate (%) Subbase Soil Type


Date
 
 
Company